EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
MaggieMaeOfKS
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (100)
Research
- (4)
Workshop
- (6)
Empennage
- (1)
Fuselage
- (41)
Firewall
Tail Feathers
Wings
- (1)
Controls
- (2)
Avionics
- (1)
Lighting
Instrument Panel
Landing Gear
Engine
- (13)
Propeller
Fuel System
- (29)
-
Painted Fuel Tank
-
Primed Fuel tank
-
Tested Fuel Tank...
-
Attached Fuel...
-
Sealed Rivets
-
Fuel Quantity Probe
-
Bondo On Outside of...
-
Assembled Fuel Tank
-
Vent Tubes, Probe...
-
Fuel Probe Mount
-
Made Gussets for...
-
Riveted Top of Tank
-
Steel Fittings, and...
-
Continued Fuel Tank
-
Fuel Tank
-
Started Top of Fuel...
-
Built Drain and...
-
Attached Flange...
-
Turned Tubes And...
-
Match Drilled Bottom...
-
Marked Rivet Hole...
-
Continued Fuel Tank
-
Continued Fuel Tank
-
Began Fuel Tank...
-
More Fuel Tank Parts...
-
More Parts Purchased
-
More Fuel Tank Parts
-
Fuel Tank Design
-
Fuel Tank Parts
Interior Finish
Paint / Decals
- (1)
Inspection
- (1)
Tools
Builder Name:
Bryce Gorrell
-
Project:
Pietenpol - Aircamper
-
VIEW REPORTS
Total Hours:
394.2
Total Flight Time:
Total Expense:
$7932.61
Start/Last Date:
Feb 01, 2017 - No Finish Date
Engine:
Bryce Gorrell, CorvAIR
Propeller:
Warp Drive
Friendly URL:
https://eaabuilderslog.org?s=MaggieMaeOfKS
Home or Last Project Picture
Feb 17, 2020
Began Fuel Tank Construction
- (5 hours)
Category: Fuel System
I glued full size printouts of my fuel tank parts to sheet aluminum, roughly cut out the parts, drilled many of the necessary holes, and fitted the aluminum angle pieces together that make up the support struts on the bottom of the tank.
IMG-0408.jpg
IMG-0409.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.